This is where the installation differs from the rest. The upper rail houses the copper contact strips.
The manual states, “If the top wall bracket is installed on a wall that is not plumb (vertical), the charging contacts will never align. Use plastic shims behind the bracket.”
The internal copper charging strips run inside the channel of the aluminum rail. Ensure they are clean, free of dust, and completely continuous across any rail joints. Use the provided plastic joint pins to align the segments perfectly. Joining Rail Sections (If Applicable) Lay the rail sections flat on a protected floor surface. thyssenkrupp levant stair lift installation manual top
The "top" of the installation also refers to the mechanical interface between the carriage and the landing.
Adjust the seat height if necessary, and ensure all brackets are tightened securely. Top Tips from the Thyssenkrupp Manual This is where the installation differs from the rest
The Thyssenkrupp Levant arrives in several components. Unpack everything carefully and inspect for damage.
Use a voltmeter to verify that 24V–30V DC is present across the internal copper charging strips when measured from the rail terminal. Step 6: Testing, Calibration, and Safety Checks Use plastic shims behind the bracket
Once the rail is securely fastened, the carriage (the unit that carries the motor) and the seat can be attached.