Cut the copper piping cleanly with a pipe cutter. Remove all internal burrs with a reamer, holding the pipe downward to prevent copper shavings from entering the line. Slip the correct flare nut onto the pipe before flaring.
Align the centers of the pipe flares with the service valves on the outdoor unit ports (labeled A, B, and C).
Failure to comply can result in fines per EU Regulation 517/2014. samsung aj068txj3kg eu installation manual
A stable foundation prevents operational noise and structural damage.
Avoid areas exposed to strong winds, direct sunlight, or heavy snow accumulation. Use a protective awning if necessary. Cut the copper piping cleanly with a pipe cutter
Check for hidden damage. If the unit was tilted beyond 30°, let it stand upright for 2 hours before operation.
Select mounting location:
This is one of the most critical stages and must be done by a professional.
Maintain a minimum distance of 300 mm behind the unit and 600 mm (or more) in front for airflow. Align the centers of the pipe flares with